How Long Does a House Rewire Take? A Realistic Timeline
A full rewire of a typical three-bedroom house usually takes around five to ten working days, but the time depends on the size of the property, access, the type of walls and whether the home is occupied. This guide explains the stages of a rewire, typical timescales for different Bath properties, and how to keep disruption to a minimum.
Typical Timescales
| Property | First fix | Second fix | Total (approx.) |
|---|---|---|---|
| One-bedroom flat | 2 to 3 days | 1 day | 3 to 4 days |
| Two-bedroom terrace | 3 to 5 days | 1 to 2 days | 4 to 7 days |
| Three-bedroom house | 5 to 7 days | 2 days | 7 to 10 days |
| Four or more bedrooms | 7 to 10 days | 2 to 3 days | 10 to 14 days |
| Large Georgian townhouse | 10 days or more | 3 days or more | 2 to 4 weeks |
These are working days for a small team. Plastering and decorating are extra.
The Stages of a Rewire
1. Survey and Planning
The electrician inspects the property, agrees socket and light positions and plans cable routes.
2. First Fix
Floorboards are lifted, channels cut in walls and new cables run to every point. The old wiring stays live where possible until the new is ready.
3. Plastering
Channels are filled and walls repaired.
4. Second Fix
Sockets, switches, lights and the consumer unit are fitted.
5. Testing and Certification
Every circuit is tested and an Electrical Installation Certificate issued. The work is notified under Part P. See electrical certificates after work explained.
What Affects the Time
- Access: furniture, fitted carpets and floor coverings slow the work.
- Wall type: solid stone and lime plaster take longer than stud walls. See rewiring old lime plaster walls.
- Listed status: listed buildings may need careful routes and consent. See rewiring listed buildings in Bath.
- Occupancy: an empty house is quicker.
- Extras: smoke alarms, data cabling, outdoor circuits and EV chargers add time.
Living at Home During a Rewire
It is possible but disruptive. Power can usually be restored at the end of each day. See can you stay home during a rewire?
Reducing Disruption
- Clear rooms in advance.
- Agree a room-by-room plan.
- Lift carpets if possible.
- Book plastering early.
- Plan for dust.
Is a Rewire Needed?
Not every old installation needs a full rewire. An EICR shows the true condition. See signs your house needs a rewire.
Frequently Asked Questions
Can I live without power during a rewire?
You usually have power at night. Some days may have longer outages.
Does a rewire include plastering?
Usually only filling channels. Full plastering is separate.
Do I need to move out?
Not usually, but an empty house is quicker.
How long does a partial rewire take?
Often one to three days per floor or area.